|
Group: Forum Members
Posts: 23,
Visits: 1.3K
|
I have received a response from Austrocontrol expressing an intention to update the permanent AIP with the relevant changes to the runway at LOIR in Spring 2018 after planned construction work has finished. There are three NOTAMs covering ongoing construction work and recent changes at LOIR in the meantime.
|